Astro Dates | Predicting the Bottom | Forum

Search

— Forum Scope —




— Match —





— Forum Options —





Minimum search word length is 3 characters – maximum search word length is 84 characters

Lost password?
sp_Feed sp_TopicIcon
Astro Dates
Avatar
Peter Temple
Calgary, Alberta, Canada
Admin
Forum Posts: 123
Member Since:
December 29, 2013
sp_UserOfflineSmall Offline
1
April 24, 2016 – 11:47 am
sp_Permalink sp_Print

(from André):

The time price vector is a simple calculation that give a weighted average of the time and price move.

When I do this calculation on the 2007-2011 cycle, I get 3/5/20. Doing the same on the 2011-2015 cycle I get 1/9/20. 

Doing this with the 2000-2009 cycle -using weeks for time – I get 11/4/19.

So 3 calculations with a range of 4 months. Very objective calculations.

Forum Timezone: America/Edmonton

Most Users Ever Online: 75

Currently Online:
6 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

houseflii: 19

Platy: 14

tedward728: 4

Joe Longwill: 2

ricardo geyer: 2

Newest Members:

Jillian Cox

Manithan Enbavan

Bryan Mayer

Ed van Paassen

Chinna Kumar

Forum Stats:

Groups: 5

Forums: 24

Topics: 106

Posts: 179

 

Member Stats:

Guest Posters: 1

Members: 1365

Moderators: 2

Admins: 1

Administrators: Peter Temple

Moderators: Whazzup, Chris Pearson